Larkspur Daily
City Council · meeting of Wednesday, Feb. 4

At the Library at The Commons, the argument wasn't whether to finish the outside — it was how much beauty costs

The longest stretch of Wednesday night was spent on three things nobody will check out at the front desk: the paving, the fountain and the sign at the Library at The Commons on Doherty Drive. Staff and the project architect brought each one for direction, and council gave it on all three.

“I'm struggling with spending $200,000 on a sign... is there something better the city can do than put a sign up in front of the library?”— Vice Mayor Pollson, on the monument sign options

Paving first. The eastern half of the parking lot will get stamped and colored asphalt so it reads as a plaza rather than a lot — base budget $50,000, with multicolor adding about $10,000. Council landed on Frisco cobble in a multicolor limestone/pewter blend, with the architect asked to tame the pattern. "The greater the difference between the enhanced parking area and the regular parking area the better," resident David Muller told council, advocating for multicolor as "the most forgiving." Mayor Andre agreed on color but not chaos, asking for something "less abstract random."

The water feature was the friendly item. A small granite bubble-up cube ran about $40,000; a larger infinity-edge spillover fountain about $75,000. Both recirculate. Donors had pledged roughly $80,000. Council took the larger one and told staff to chase the sound — Muller again: "What people like most about having a water feature is the sound of the water." Vice Mayor Pollson, who has something similar at home, noted you can exaggerate the splash by running the pump faster. Ann Morrison of the Commons Foundation said donors originally wanted jets shooting into the air, but safety and liability steered them to the spillover.

Then the sign, and the mood changed. Option one was a plain LED scrolling sign like Hall Middle School's — about $50,000, already budgeted. Option three, the architect's pick, is two 84-inch outdoor screens clad to match the building, at $170,000 to $200,000. Commons Foundation donors had pledged money specifically for a monument sign. Council reached a soft consensus on option three while pushing staff toward the low end; Council Member Kandell said it kills him to spend $200,000 on a sign but that honoring donor intent is the city's responsibility. The city manager offered a cushion: the sign isn't needed to open the doors. And the doors have a date — the library opens Saturday, March 28, 2026, ahead of spring break, rain or shine.

City Council · public hearing, meeting of Feb. 4

Building code update clears its third hearing, over a resident's push for neighbor notice on permit extensions

Council unanimously adopted Ordinance 1096, folding the 2025 California Building Standards Code into Title 15 by reference and carrying forward Larkspur's existing local amendments. It took a third hearing because of a defect in earlier notice publication. Staff reminded council that under state law AB 130 the city has very little room left to write its own amendments.

“I'd suggest that the ordinance require permittees to post notices of the proposed extension within 300 feet of the project property so neighbors will know of the proposal... don't let the contractor's own conduct justify an extension.”— James Holmes, public comment on Ordinance 1096

The one live argument came from public commenter James Holmes, who wanted permit extensions handled differently — notice to neighbors, and no credit for a contractor's own delays.

Council wasn't persuaded. One member said Larkspur simply doesn't have a chronic problem with projects dragging on and that he's never seen the extension provision used as a tactic; Mayor Andre added that the past year has been brutal for builders, with tariffs delaying supplies. A separate exchange questioned the 50% valuation trigger — a 500-square-foot remodel adds less relative value to a 2,500-square-foot house than to a 1,000-square-foot one — and the building official answered that Corte Madera, San Anselmo and Fairfax all use the same language, a common California standard.

City Council · public comment, meeting of Feb. 4

A neighbor's warning: teen bike jumps near William and Chanticleer are launching riders into the street

Resident Mr. Zaglin used public comment to describe illegal bike jumps and trails that groups of pre-teens and teens have carved into a hillside near the corner of William and Chanticleer, close to 304 Williams. Riders come off the hill straight into the roadway, he said, and he's had to slam his brakes more than once. Last year, he told council, he watched a car swerve toward a woman pushing a baby carriage to avoid a bike that shot into the intersection.

“We will review this. I will commit to reviewing this and we will work with staff to respond and perhaps agendaize this item so that we can actually have a full discussion.”— Mayor Andre, responding to public comment

Beyond the near-misses, Zaglin cited erosion and damage to public property — and said police warnings have not stopped it.

Mayor Andre committed to reading his letter, with the city manager to follow up directly and the possibility of a full agenda item later. That's the thing to watch: whether this shows up as a staff report or stays a comment in the record.

City Council · meeting of Feb. 4 and special workshop, Saturday, Feb. 7

Midyear books come in ahead — and flood work moves to the front of the year's list

The midyear budget review was the rare fiscal item that reads as good news: council unanimously adopted Resolution 08/26, with general fund revenues revised up $787,000 to $25.9 million against expenditures up $714,000 to $25.3 million. The drivers were building permit and plan check activity, investment income and the arrival of new library operating costs. Asked point-blank whether revenues had outrun expenses, Administrative Services Director Amelia Gabrielle confirmed they had. The city manager flagged the soft spot ahead: IT and grounds maintenance for the new building aren't yet fully budgeted.

“Even though our expenses have gone up, our revenues have gone up by more than our expenses. Am I reading that correctly?”— Council member, during the midyear budget review

Water was the other through-line. On consent, council took up Resolution 09/26, amending the capital budget and authorizing a consultant agreement with Schaaf and Wheeler for the Larkspur Plaza Drive Storm Drain Pump Station and Flood Wall Project (CIP 25-304). In reports, a council member relayed that FEMA has determined a single downstream property owner's objection can block the Bridge 2 removal project in Flood Zone 9, with a possible rescoping carrying a $20 million price tag and resolution expected around March 1. Separately, Ross Valley Sanitary District plans a 2027 force main capacity increase and 2028 gravity sewer work in response to King Tide flooding in the Larkspur Marina neighborhood — work that could retire as many as four pump stations there.

Saturday morning, council reconvened for a special Strategic Planning Workshop to set the year's direction. Per the agenda, the list included the Capital Improvement Plan, a review of the zoning ordinance and other planning regulations, anticipated development applications, building code policy, and flood prevention and mitigation. No decisions were taken — the agenda says so explicitly — but council can direct staff to bring topics back, which is where a workshop becomes an actual item. The workshop adjourned to the regular meeting of February 18.

Also in Larkspur